Skip to content
SixSix

Running Tracks

New running track installation, track refinishing and lane striping for schools and athletic facilities.

We install new running tracks and refinish existing ones. Refinishing restores the wearing surface and includes restriping lanes and event markings.

A new surface is only as good as the base under it. Before refinishing, the track is checked for cracking, settlement and drainage problems that would shorten the life of the new surface.

Facility types

  • Running tracks
  • Track and field event areas

Scope of Work

The usual work items on a running track project. The final scope is set after the site visit and written into the proposal.
  1. 01

    New track installation

    Base preparation, surface installation and full striping.

  2. 02

    Track refinishing

    Cleaning, repairs and a new wearing surface over the existing track.

  3. 03

    Striping

    Lane lines, start and finish lines, exchange zones and event markings.

Construction Considerations

These decisions have the most effect on cost, schedule and how long the work lasts. We go over them during the site visit.

Surface system
Track surfaces come in several systems at different price points. The right one depends on budget, how heavily the track is used and whether it hosts meets.
Base condition
Refinishing only works over a sound base. Cracking, settlement and drainage problems are corrected first.
Measurements
A standard outdoor track is 400 meters. Lane widths and event markings follow the rules for your level of competition.
Scheduling
Track work is planned around the sports season and the school calendar. Start early if you have a target window.

Frequently Asked Questions

See also the general FAQ.

Can our track be refinished instead of replaced?

Often, if the base is sound. We inspect the surface and base and tell you whether refinishing will last or whether replacement is the better use of the budget.

Do you restripe tracks?

Yes. Striping is part of every new install and refinish, and can be done on its own when lines are worn.

Request a Project Quote

Send the project location, facility type and timing. We will follow up to schedule a site visit.