Project Process
Each project gets a site visit, a written proposal and a schedule that accounts for weather and cure time.
- 01
Inquiry
Send the project location, facility type, timing and anything you know about the site. We follow up to discuss it.
- 02
Site visit
We inspect the existing surface, base, drainage and access. Most pricing decisions are made at this stage.
- 03
Proposal
A written scope, recommended approach and price that an owner, board or administrator can review and approve.
- 04
Scheduling
Dates are set around your calendar and the weather the work needs. Closures, access and staging are confirmed.
- 05
Construction
Site preparation, base, surfacing and striping, in the order the materials require, including cure time.
- 06
Final walkthrough
We walk the finished work with you and go over care and maintenance.
Cost and Schedule Factors
- Site conditions
- Soil, existing pavement, drainage and equipment access have the largest effect on scope and price.
- New construction or resurfacing
- Resurfacing costs much less than reconstruction, but only works when the base is sound.
- Surface system
- Standard and cushioned court surfaces, track systems and floor types differ in cost, feel and maintenance.
- Weather and cure time
- Coatings and new pavement need dry weather, suitable temperatures and time to cure.
- Fencing, lighting and amenities
- These affect layout and footing locations and should be included from the start.
- Approvals
- Boards, owners, HOAs and districts often need to sign off. A written scope keeps approvals moving.
How an Outdoor Court Is Built
The subgrade carries the load. The aggregate base is graded to the slope. Asphalt or concrete provides the structural surface. Acrylic resurfacer fills the pavement texture, and the color coats provide color, texture and ball response. Lines are painted last.
Problems in a lower layer show up in the layers above it, which is why resurfacing starts with an inspection.
- 01Line paintMeasured, taped and painted
- 02Acrylic color coatsColor and surface texture
- 03Acrylic resurfacerFills the pavement texture
- 04Asphalt or concreteSet to the final slope
- 05Aggregate baseCompacted and graded
- 06SubgradeExcavated and compacted
Diagram only. Layers and thicknesses are specified for each project.
Request a Project Quote
Send the project location, facility type and timing. We will follow up to schedule a site visit.