Court Construction

New tennis, pickleball, basketball and shuffleboard courts, including site work, base, surfacing and striping.

We build new outdoor courts on asphalt or concrete. A typical project covers site preparation, grading, the base and slab, acrylic surfacing and line striping.

Standing water, cracking and soft spots usually trace back to the subgrade and drainage. Grades and the base are set before any coating goes down.

Facility types

  • Tennis courts
  • Pickleball courts
  • Basketball courts
  • Shuffleboard courts

Dimensions and layouts by sport:

Scope of Work

The usual work items on a court construction project. The final scope is set after the site visit and written into the proposal.
  1. 01

    Site preparation

    Clearing, excavation and compaction of the subgrade.

  2. 02

    Grading and drainage

    The court is graded to a single plane so water runs off one side or end instead of collecting on the playing surface.

  3. 03

    Base and slab

    A compacted aggregate base topped with asphalt or concrete, selected for the site, the budget and how the court will be used.

  4. 04

    Acrylic surfacing

    Resurfacer and color coats applied once the asphalt or concrete has cured.

  5. 05

    Court striping

    Lines measured, taped and painted for each sport. One court can carry lines for more than one sport.

Construction Considerations

These decisions have the most effect on cost, schedule and how long the work lasts. We go over them during the site visit.

Asphalt or concrete
Asphalt costs less to install. Post-tensioned concrete costs more and holds up better against cracking. The choice depends on soil conditions, budget and how long you plan to keep the court.
Orientation
Outdoor courts are normally laid out north to south so players are not facing a low sun.
Cure time
New asphalt and concrete have to cure before acrylic coatings are applied. Coating too early leads to blistering and delamination, so the wait is built into the schedule.
Fencing and lighting
Fence posts and light poles affect the court layout and footing locations. If either is part of the project, we need to know before layout.

Frequently Asked Questions

See also the general FAQ.

How much space does a new court need?

A single tennis court with run-off takes about 60 by 120 feet. A single pickleball court takes about 30 by 60 feet. Each court page lists typical dimensions, and exact sizing is confirmed on the site visit.

Can one court be used for more than one sport?

Yes. Pickleball lines are often added to tennis courts, and basketball and pickleball can share a slab. Dedicated courts are better for heavy use.

What affects the price of a new court?

Site conditions and earthwork, asphalt or concrete, total area, the surfacing system, and extras such as fencing and lighting. We price after seeing the site.