Skip to content
SixSix

Athletic Fields

Construction of baseball, softball, football and soccer fields, including grading and drainage.

We build baseball, softball, football and soccer fields. Most of the work is grading and drainage. A field that drains well is playable sooner after rain and holds up better over a season.

Facility types

  • Baseball fields
  • Softball fields
  • Football fields
  • Soccer fields

Scope of Work

The usual work items on a athletic field project. The final scope is set after the site visit and written into the proposal.
  1. 01

    Layout

    Field orientation and dimensions for your level of play and the space available.

  2. 02

    Grading

    Grades that move surface water off the field without a slope players can feel.

  3. 03

    Drainage

    Surface and subsurface drainage based on the site's soil and rainfall.

  4. 04

    Infields and playing surface

    Infield and playing surface construction for the sport and the maintenance the program can support.

Construction Considerations

These decisions have the most effect on cost, schedule and how long the work lasts. We go over them during the site visit.

Diamond dimensions
High school and older baseball uses 90-foot base paths. Softball typically uses 60 feet. Outfield distances depend on level of play and available land.
Shared fields
Football and soccer often share a field. Both layouts are planned together so goals, lines and wear areas work for each.
Maintenance
Natural grass and synthetic turf need very different maintenance. Who will maintain the field affects which surface makes sense.
Site access
Equipment access, staging, existing irrigation and underground utilities are located before work starts.

Frequently Asked Questions

See also the general FAQ.

Can one field be used for football and soccer?

Yes. Multi-use fields are common at schools. Both layouts are planned together.

Our field floods after every storm. Can that be fixed?

Usually. Standing water points to grading or drainage problems that can be corrected. The first step is a site visit.

Request a Project Quote

Send the project location, facility type and timing. We will follow up to schedule a site visit.